
Out of Stock
APC MGE Galaxy 6000 WG6T450K-OPT2-SPL2 Support Set | UPS Spare Kit
APC
MPN: WG6T450K-OPT2-SPL2
$31,390.15$52,960.00
Free shipping on orders over $500
Authorized Dealer — Full manufacturer warranty
Key Features
- APC spare part kit level 2
- Designed for MGE Galaxy 6000 Parallel UPS
- Supports 450 kVA configurations
- Parallel UPS support set
- Service replacement component kit
- Enterprise power infrastructure accessory
- Preserve service continuity with a support set sized for 450 kVA Galaxy 6000 parallel UPS deployments
- Reduce repair delays using a spare part kit level 2 for planned maintenance workflows
Protect critical power infrastructure with a support set designed for the MGE Galaxy 6000 Parallel UPS platform. This APC spare part kit level 2 is intended for 450 kVA systems, giving service teams the parts path they need to keep large-scale UPS deployments in maintenance windows instead of emergency recovery.
In enterprise power environments, the difference between a stocked support kit and a delayed repair can be measured in downtime, risk, and labor cost. This kit is positioned for organizations that standardize on Galaxy 6000 parallel architectures and want a replacement path aligned to the original platform rather than a generic substitute.
For procurement teams, the value is straightforward: reduce service uncertainty, preserve compatibility, and keep high-availability power assets supportable over their lifecycle. For operations teams, it means faster response when a planned swap or corrective action is required. For infrastructure leaders, it helps protect the investment already made in a 450 kVA UPS deployment.
Ideal For
- Planned maintenance for installed Galaxy 6000 parallel UPS systems
- Spare parts stocking for data center power teams
- Field replacement during corrective service events
- Lifecycle support for 450 kVA UPS deployments
Why This Product
- 1Purpose-built for the Galaxy 6000 parallel UPS family
- 2Sized for 450 kVA support requirements
- 3Better fit than generic replacement parts
- 4Helps reduce downtime during planned service





