APC Authorized Partner STORE|Enterprise power protection and cooling solutions from an authorized APC dealer
APC Authorized Partner
APC PBP4A11IEC20C busway tap-off unit, 20 A 240 V, 1 x 1 pole, 3-wire phase C, one drop cord
Out of Stock

APC PBP4A11IEC20C Busway Tap Off Unit 20A 240V | Power Distribution

APC

MPN: PBP4A11IEC20C

$987.72$1,480.00
Contact Us for Availability
Free shipping on orders over $500
Authorized Dealer — Full manufacturer warranty

Key Features

  • 20 A input current
  • 240 V input voltage
  • 1 x 1 pole configuration
  • 3-wire phase C design
  • 1 drop cord included
  • Busway tap-off unit
  • Direct-ship deployment
  • Deliver dedicated branch power using a 20 A, 240 V tap-off configuration
Route power from a busway to a dedicated load point with a tap-off unit designed for controlled branch distribution. This APC Schneider Electric unit is specified for 20 A operation at 240 V and supports a 1 x 1 pole, 3-wire, phase C configuration with one drop cord. That makes it a practical fit for infrastructure teams that need a defined connection point without adding unnecessary complexity to the power path. In dense electrical environments, the value is in precision: the right current, the right voltage, and the right connection method for the load being served. This model is intended for direct-ship deployment, helping streamline procurement and installation planning for busway-based power distribution. It is suited to environments where consistent delivery and orderly branch routing matter more than generic, one-size-fits-all power accessories. Choose this tap-off unit when you need a specific busway interface that aligns with established electrical design and supports dependable downstream distribution. It is a focused component for teams building structured power architectures, not a general-purpose power strip.

Ideal For

  • Busway-fed branch power for a single rack or cabinet load
  • Structured electrical distribution in data center power corridors
  • Downstream connection point for phase C busway installations
  • Controlled power delivery in facilities standardizing on busway infrastructure

Why This Product

  • 1Purpose-built for busway distribution, not general rack power
  • 220 A, 240 V rating supports defined downstream loads
  • 31 drop cord simplifies a single connection point
  • 4Phase C, 3-wire design fits structured electrical planning
APC PBP4A11IEC20C Busway Tap Off Unit 20A 240V | Power Distribution | APC Authorized Partner