APC Authorized Partner STORE|Enterprise power protection and cooling solutions from an authorized APC dealer
APC Authorized Partner
Scheduled assembly service 5x8 for InRow RD10 kW water/glycol and air cooled systems
Out of Stock

Scheduled Assembly Service 5x8 for InRow RD10 KW | APC Deployment

APC

MPN: WASSEM5X8-AX-15

$1,515.54$2,210.00
Contact Us for Availability
Free shipping on orders over $500
Authorized Dealer — Full manufacturer warranty

Key Features

  • Scheduled assembly service
  • 5x8 service window
  • For InRow RD10 kW systems
  • Supports water/glycol and air cooled configurations
  • Professional services deployment model
  • Designed for planned site execution
  • Coordinate cooling rollout with scheduled assembly service for InRow RD10 kW water/glycol and air cooled systems
  • Reduce project friction using a planned 5x8 service window
Coordinate InRow cooling deployment with a scheduled assembly service built for planned implementation windows. For RD10 kW water/glycol and air cooled systems, this service helps teams move from delivery to assembled readiness without forcing internal staff to absorb the full installation burden. In data center environments, timing matters. A structured 5x8 assembly window makes it easier to align mechanical work, site access, and operational change control. That reduces friction during rollout and helps keep cooling infrastructure projects moving on a defined schedule. This service is a strong fit when the goal is not just to receive equipment, but to have it assembled in a controlled way that supports a clean transition into commissioning or final integration. It is especially useful for teams managing multiple trades, limited maintenance windows, or site standards that require predictable service execution.

Ideal For

  • Assembling InRow cooling equipment during a planned data center maintenance window
  • Supporting a new cooling deployment where site access is limited to business hours
  • Coordinating mechanical installation with electrical and commissioning teams
  • Reducing internal workload during a multi-site cooling rollout

Why This Product

  • 1More predictable than unscheduled installation work
  • 2Better aligned to data center maintenance windows
  • 3Reduces internal coordination overhead
  • 4Supports both water/glycol and air cooled systems